A brand new house is not a finished house. It is a house that a lot of different trades worked on quickly, in sequence, under schedule pressure. Municipal inspections confirm code compliance at specific stages. They are not the same as somebody walking the whole finished product on your behalf.
Call 803-365-5890Missing or compressed insulation, ductwork that came loose in the attic, plumbing that was never fully secured, bath fans venting into the attic instead of outside, flashing details rushed at the roof to wall transition, grading that slopes back toward the foundation, and finish work that was signed off in a hurry. None of it is scandal. It is what happens when twenty trades work one house.
The useful moment is before your final walkthrough, so the punch list you hand the builder is documented and specific rather than a memory of something you noticed once. Photos with locations make items much harder to wave off.

A written report changes the tone of the conversation. It is no longer your opinion against the superintendent's, it is a documented item with a photo. Most builders in this market will address a clearly documented finding without much argument.
The first year of a house reveals settlement, seasonal movement and anything installed wrong that has not failed yet. Pair this inspection with an eleven month warranty inspection and you have covered both ends of the warranty period.
Not everything on the list carries the same weight. Anything involving water getting into the structure, anything electrical, and anything that will be permanently covered by finish work should be corrected before you close, because your leverage drops to nearly zero the moment you sign. Cosmetic and adjustment items can reasonably go on a punch list to be handled after. We flag which category each finding falls into so you are not spending your leverage on paint.
Municipal inspections verify code compliance at defined stages, often before drywall covers everything. They are not a whole-house condition report performed for you, and the inspector does not work for you.
Almost always. If a builder resists an independent inspection before closing, that itself is worth knowing.
Shortly before your final walkthrough, once the house is essentially complete but while there is still time to correct items before closing.
South Carolina's wood infestation report, covering termite and moisture damage in accessible areas.
Placed and retrieved on schedule, with lab results reported in plain numbers you can act on.
Where moisture is getting in, what is growing because of it, and what has to dry out first.
A camera down the main line to find breaks, bellies and root intrusion before you own them.
Tell us the address and the closing date and we will get you on the schedule.
Call 803-365-5890 Email the office